  • A Few Thoughts on Pre-Fabricated Data Centers

    By Steve Altizer, Compu Dynamics While the concept of pre-fabricated data centers is nothing new, we’ve recently noticed an elevated level of dialogue on the topic. The term “pre-fabricated” was first applied to data centers approximately 10-12 years ago. At that time, the industry standard was a reconstituted and retrofitted ISO container jam-packed with racks,… Read More »

  • Compu Dynamics Announces the Opening of Their New Compu Dynamics’ Phoenix Office

    Washington DC-based Compu Dynamics announces the opening of a new office in the Phoenix area Washington DC – Compu Dynamics, a leading provider of mission critical data center services, announced this week that they have opened a new office in the Phoenix area. The new branch location marks the beginning of Compu Dynamics’ western expansion.… Read More »

  • Tranforming Telephone Closets into Modern Network Centers

    In most buildings constructed before the turn of the century, tenants are fighting a losing battle trying to adapt legacy analog telephone closets to serve today’s internet-enabled digital network equipment.  In the old days (1990’s), phone closets needed little-to-no ventilation, only a few inches of depth, and perhaps one electrical outlet.  Modern network centers (I… Read More »

  • Key Considerations for White Space Builds

    By Steve Altizer, President – Compu Dynamics, LLC Hyperscale and multi-MW (Mega Watt) colocation deployments are driving the unprecedented development of dozens of large data centers.  Much of this growth has been focused around major cities such as Ashburn, Dallas, Phoenix, and Chicago, where network providers are able to share traffic.  Our experience with data… Read More »

  • The Proper Steps for a Successful Data Center Migration

    Data Center migrations are high profile projects because they are risky.  Worries about lost data and excessive downtime haunt executives, users and data center managers alike. Migrating your data center is a complex process that requires a high degree of coordination with little tolerance for failure.  The goals of any move are to: Minimize or… Read More »